Ameeba Chat App store presentation
Download Ameeba Chat Today
Ameeba Blog Search

CVE-2025-54261: Critical Path Traversal Vulnerability in ColdFusion

Ameeba’s Mission: Safeguarding privacy by securing data and communication with our patented anonymization technology.

Overview

In this post, we are delving into a critical vulnerability, CVE-2025-54261, that impacts multiple versions of the ColdFusion web application development platform. This vulnerability, termed as an ‘Improper Limitation of a Pathname to a Restricted Directory’ or ‘Path Traversal’ vulnerability, potentially allows an attacker to execute arbitrary code on the affected system. It is important to address this vulnerability due to its high severity score and the potential for system compromise or data leakage.

Vulnerability Summary

CVE ID: CVE-2025-54261
Severity: Critical (9.0)
Attack Vector: Network
Privileges Required: None
User Interaction: None
Impact: System compromise and potential data leakage

Affected Products

Ameeba Chat Icon Escape the Surveillance Era

Most apps won’t tell you the truth.
They’re part of the problem.

Phone numbers. Emails. Profiles. Logs.
It’s all fuel for surveillance.

Ameeba Chat gives you a way out.

  • • No phone number
  • • No email
  • • No personal info
  • • Anonymous aliases
  • • End-to-end encrypted

Chat without a trace.

Product | Affected Versions

ColdFusion | 2025.3
ColdFusion | 2023.15
ColdFusion | 2021.21 and earlier

How the Exploit Works

A ‘Path Traversal’ vulnerability occurs when an application improperly restricts the user’s ability to navigate the file directory. In the case of CVE-2025-54261, an attacker can exploit this vulnerability to make ColdFusion execute arbitrary code in a location of their choosing. This is achieved by manipulating variables that reference file paths in the system.

Conceptual Example Code

As an example, the attacker might use a malicious HTTP request similar to the following:

POST /CFIDE/adminapi/administrator.cfc?method=login HTTP/1.1
Host: target.example.com
Content-Type: application/x-www-form-urlencoded
cfadminPassword=attacker&requestedfilepath=../../../../../etc/passwd&newfilepath=attacker-controlled-path

In the above example, the “requestedfilepath” parameter is manipulated to move out of the intended directory (‘../../../’) and read the “/etc/passwd” file. The “newfilepath” parameter is then used to specify the location where the attacker wants to write the file.
The above is a simplified example and real-world attacks would likely be more complex and tailored to the target environment.

Mitigations

Users of affected versions of ColdFusion are advised to apply the vendor patch as soon as it is available. As a temporary mitigation, using a Web Application Firewall (WAF) or Intrusion Detection System (IDS) can help detect and block attempts to exploit this vulnerability. However, these measures are not a substitute for applying the vendor patch and should be seen as a stopgap, rather than a long-term solution.

Talk freely. Stay anonymous with Ameeba Chat.

Disclaimer:

The information and code presented in this article are provided for educational and defensive cybersecurity purposes only. Any conceptual or pseudocode examples are simplified representations intended to raise awareness and promote secure development and system configuration practices.

Do not use this information to attempt unauthorized access or exploit vulnerabilities on systems that you do not own or have explicit permission to test.

Ameeba and its authors do not endorse or condone malicious behavior and are not responsible for misuse of the content. Always follow ethical hacking guidelines, responsible disclosure practices, and local laws.
Ameeba Chat