Ameeba Exploit Tracker

Tracking CVEs, exploits, and zero-days for defensive cybersecurity research.

Ameeba Blog Search
TRENDING · 1 WEEK
Attack Vector
Vendor
Severity

CVE-2025-32629: Critical Path Traversal Vulnerability in WP-BusinessDirectory Plugin

Ameeba Chat Store screens
Download Ameeba Chat

Overview

The cybersecurity community has recently flagged a critical vulnerability, identified as CVE-2025-32629, affecting the popular WordPress Business Directory plugin, WP-BusinessDirectory. This vulnerability arises from an improper limitation of a pathname to a restricted directory, commonly known as a ‘Path Traversal’ vulnerability. It can potentially result in system compromise or data leakage, posing a significant threat to those websites using a WP-BusinessDirectory version from n/a through 3.1.2.
This vulnerability is of particular concern due to the widespread use of WordPress plugins and the potential for attackers to gain unauthorized access to sensitive data or execute malicious activities. It underscores the importance of regular software updates and diligent cybersecurity practices.

Vulnerability Summary

CVE ID: CVE-2025-32629
Severity: Critical, CVSS score 8.6
Attack Vector: Network
Privileges Required: None
User Interaction: None
Impact: System compromise and potential data leakage

Affected Products

Ameeba Chat Icon Escape the Surveillance Era

Most apps won’t tell you the truth.
They’re part of the problem.

Phone numbers. Emails. Profiles. Logs.
It’s all fuel for surveillance.

Ameeba Chat gives you a way out.

  • • No phone number
  • • No email
  • • No personal info
  • • Anonymous aliases
  • • End-to-end encrypted

Chat without a trace.

Product | Affected Versions

WP-BusinessDirectory | n/a through 3.1.2

How the Exploit Works

The vulnerability resides in the improper handling of directory traversal sequences in the WP-BusinessDirectory plugin. This oversight allows an attacker to manipulate the file path in a way that tricks the system into accessing directories it should not be able to. By exploiting this vulnerability, an attacker could potentially access, read, or modify sensitive files that reside outside the intended directories, leading to leakage of sensitive data or even system compromise.

Conceptual Example Code

Here’s a conceptual example of how the vulnerability might be exploited. This example uses an HTTP request with a manipulated path to access a restricted file:

GET /wp-content/plugins/wp-businessdirectory/path/to/file/../../../../../etc/passwd HTTP/1.1
Host: vulnerable-website.com

In this example, the `../../../../../etc/passwd` part of the request is an attempt to traverse back through the directory structure to access the `/etc/passwd` file, a common target for path traversal attacks due to its potential to contain sensitive user information.

Recommended Mitigations

WP-BusinessDirectory users are strongly advised to apply the vendor-provided patch to address this vulnerability. As a temporary mitigation, users can also employ a Web Application Firewall (WAF) or Intrusion Detection System (IDS) to detect and block attempts to exploit this vulnerability. However, these methods are not a substitute for patching the vulnerability at its source and should be used in conjunction with the vendor’s patch.

Want to discuss this further? Join the Ameeba Cybersecurity Group Chat.

Disclaimer:

The information and code presented in this article are provided for educational and defensive cybersecurity purposes only. Any conceptual or pseudocode examples are simplified representations intended to raise awareness and promote secure development and system configuration practices.

Do not use this information to attempt unauthorized access or exploit vulnerabilities on systems that you do not own or have explicit permission to test.

Ameeba and its authors do not endorse or condone malicious behavior and are not responsible for misuse of the content. Always follow ethical hacking guidelines, responsible disclosure practices, and local laws.
Ameeba Chat